The Circular Home · Research update
Foundation comparison.
Four ways to support the reference building, compared on the same hypothetical site.
Status: a research framework. Nothing below is a quotation or an engineering design. Each cell is a direction to test, not a finding, until we have an engineer and supplier information for the same site.
The 100 mm slab in the Mallee specification
Our research partner reports that the NCC 2022 ABCB Housing Provisions illustrate 100 mm slab panels within certain footing and stiffened raft systems: Part 4.2 (footings and slabs), clause 4.2.14 (stiffened rafts, Class A, S and M sites), Figures 4.2.14a and 4.2.14b, NCC Volume Two H1D4 and AS 2870. There is reported to be no universal 125 mm minimum for every residential footing system. We have not read the provisions ourselves, so this is reported, not checked. Source: NCC 2022 ABCB Housing Provisions (PDF).
The Mallee document appears to specify the slab panel for energy modelling. The 100 mm figure is therefore not inherently non-compliant, and it does not establish the footing design. Edge beams, internal beams, reinforcement, site classification and footing design are unknown. Queensland is reported to apply NCC 2022 until it adopts NCC 2025 on 1 May 2027 (Business Queensland, building laws, codes and standards).
These theoretical slab panel volumes use the stated 174 m² footprint. They are sensitivity calculations, not foundation quantities. They exclude beams, footings, rebates, set-downs and waste.
| Slab panel thickness | Theoretical volume over 174 m² | Difference from 100 mm |
|---|---|---|
| 100 mm | 17.40 m³ | |
| 125 mm | 21.75 m³ | +4.35 m³ (25%) |
| 150 mm | 26.10 m³ | +8.70 m³ (50%) |
A hypothetical Class S site
Hypothetical scenario For a first comparison we assume a Class S site (slightly reactive clay, as we understand AS 2870), flat, with ordinary access. We have not confirmed that Class S is suitable for this research or how common it is in South East Queensland, and the choice may change. We will then test Class M, and later Class H, where ground movement is larger and the answer for each system may change. We do not assume one foundation system suits every site. Screw piles in particular depend on ground conditions and slope.
What we will compare
Four systems, fourteen criteria. Entries describe what each system involves in general, with company claims marked as such.
| Criterion | Stiffened raft (conventional) | EPS waffle pod | BIAX | Screw piles with suspended floor |
|---|---|---|---|---|
| Excavation | Trimmed ribs and edge beams in a shallow excavation | Shallow excavation with a level pad | As for a waffle slab | Minimal bulk excavation, with pile positions only. Site access for a drill rig is a question |
| Imported fill | Often needed to form a level pad. Quantity depends on the site | As for a raft | As for a raft | May need little, because the floor is suspended. Depends on slope and drainage |
| Concrete volume | Slab panel plus ribs and edge beams (17.4 m³ is the panel alone at 100 mm) | Often claimed to use less concrete than a conventional raft. To verify | Company claims less concrete. To verify (see profile) | No ground slab. Pile caps or foundations if any. Concrete may still be used elsewhere |
| Reinforcement | Mesh and bar in ribs, set by the engineer | Set by the engineer | Company claims lower-grade reinforcement. To verify | Steel piles and framing carry loads. Floor framing is timber or steel |
| Void formers | None | Expanded polystyrene pods | Recycled polypropylene void formers | None |
| Formwork | Edge formwork and trench forming for ribs | Edge formwork. Pods form the ribs | Edge formwork. Void formers form the ribs | None for slab. Pile positioning and bracing |
| Labour | Unknown, to quote | Unknown, to quote | Company claims faster installation. Unverified | Specialist pile installer plus floor framing crew. Unknown, to quote |
| Equipment | Excavator, concrete pump, finishers | As for a raft, plus pod handling | As for a waffle slab, plus void former handling | Screw pile drive head and rig, crane or lifting for framing |
| Construction duration | Unknown, to quote | Unknown, to quote | Company claims faster. Unverified | Unknown, to quote |
| Thermal performance | Mallee specifies no under-slab insulation. Slab-on-ground thermal mass helps the modelled result | Voids can change edge and underfloor behaviour. Needs modelling | Needs modelling. Void material and air gap differ from EPS | Insulated suspended floor is possible but loses slab thermal mass. Needs modelling |
| Embodied emissions | Driven mostly by concrete and steel quantities | Less concrete may be offset by fossil-based EPS. To assess | Recycled polypropylene. The product EPD is summarised in our profile | Steel piles and framing. Needs a life cycle comparison |
| Waste | Concrete overpour and formwork offcuts | EPS offcuts and pods | Reusable pods. Reported, unverified | Few site wastes. Framing offcuts |
| Engineering requirements | Footing design to AS 2870 for the site class | Footing design to AS 2870 for the site class | Engineer-designed. Manufacturer reports certification (see profile) | Engineer-designed for loads and soil. Ground conditions affect feasibility |
| Total installed cost | Unknown, to quote | Unknown, to quote | Unknown, to quote. No whole-slab cost has been published | Unknown, to quote |
See the BIAX profile for what we have verified about that system.
What we need next
- A structural engineer’s indicative designs for all four systems on the same hypothetical Class S site.
- Supplier quotes using the quotation schedule: concrete, reinforcement, pods, piles, labour, equipment and programme.
- Thermal modelling of each floor type in the Mallee design (NatHERS), since the design relies on slab thermal mass.
- A life cycle comparison for the same slab area and the same service life.
Back to The Circular Home, the reference building and takeoff or the quotation schedule.