The Circular Home · Research method
Supplier quotation schedule.
What we ask manufacturers, suppliers and installers, so assumptions can be replaced with market information.
The hypothetical cost framework in early findings is a modelling assumption. This schedule lists the information we need to replace it, line by line. We compare complete assemblies of equal performance, using the quantities in the preliminary takeoff. Quotes will be recorded with their date, inclusions, GST treatment and source, and published only with the supplier’s agreement. A request for information is not an endorsement or a recommendation.
| Information needed | What we ask for | Why it matters | How we record it |
|---|---|---|---|
| Product quantities | Quantity by product for the reference building, and the measurement basis the supplier used | Checked against our takeoff | Takeoff drawing and method |
| Delivered prices (South East Queensland) | Price per unit, delivered, with GST stated and the date the price is valid to | Replaces hypothetical rates | Quote date and validity |
| Installation labour | Installed rate or labour hours per m² or per unit, and what the hours include | Defines "installed" cost | Person-hours or crew-hours stated |
| Crew sizes | Number and type of trades per crew, and whether specialist training is needed | Supports labour comparison | Trades and licences |
| Installation equipment | Cranes, lifters, formwork, mixers or other plant needed on site | Affects site cost and access | Hire or supply arrangement |
| Fixings and accessories | Fasteners, brackets, membranes, flashings, sealants and other required items | Often omitted from unit prices | Itemised list |
| Finishing requirements | Render, plaster, paint, cladding or sealing needed, and who supplies it | Needed for equal finish | Finish level compared |
| Lead times | Time from order to delivery, and from delivery to installed | Affects programme and finance | Weeks, with assumptions |
| Waste allowances | Wastage percentage assumed in the quote, and offcut handling | Prevents double counting | Percentage and basis |
| Structural and compliance documentation | Engineering, certificates, test reports, fire, acoustic, thermal and moisture data, and the current status of any certification | Needed to show equal performance | Document list, issue dates, currency |
Eight enquiries are drafted for review and have not been sent: BIAX, Durra Panel, HempBLOCK, KOSP, RespiraBuilt, a waffle pod supplier, a Queensland concreter and a prefabricated timber wall manufacturer.
First comparisons
- Conventional slab and a BIAX slab, engineered for the same site.
- Conventional internal partitions and Durra Panel.
- Conventional external walls and hemp block assemblies (not applying other suppliers’ prices to HempBLOCK).
- Site-built framing and prefabricated wall panels.
Return to The Circular Home.