The Circular Home · Research method

Supplier quotation schedule.

What we ask manufacturers, suppliers and installers, so assumptions can be replaced with market information.

The hypothetical cost framework in early findings is a modelling assumption. This schedule lists the information we need to replace it, line by line. We compare complete assemblies of equal performance, using the quantities in the preliminary takeoff. Quotes will be recorded with their date, inclusions, GST treatment and source, and published only with the supplier’s agreement. A request for information is not an endorsement or a recommendation.

Information neededWhat we ask forWhy it mattersHow we record it
Product quantitiesQuantity by product for the reference building, and the measurement basis the supplier usedChecked against our takeoffTakeoff drawing and method
Delivered prices (South East Queensland)Price per unit, delivered, with GST stated and the date the price is valid toReplaces hypothetical ratesQuote date and validity
Installation labourInstalled rate or labour hours per m² or per unit, and what the hours includeDefines "installed" costPerson-hours or crew-hours stated
Crew sizesNumber and type of trades per crew, and whether specialist training is neededSupports labour comparisonTrades and licences
Installation equipmentCranes, lifters, formwork, mixers or other plant needed on siteAffects site cost and accessHire or supply arrangement
Fixings and accessoriesFasteners, brackets, membranes, flashings, sealants and other required itemsOften omitted from unit pricesItemised list
Finishing requirementsRender, plaster, paint, cladding or sealing needed, and who supplies itNeeded for equal finishFinish level compared
Lead timesTime from order to delivery, and from delivery to installedAffects programme and financeWeeks, with assumptions
Waste allowancesWastage percentage assumed in the quote, and offcut handlingPrevents double countingPercentage and basis
Structural and compliance documentationEngineering, certificates, test reports, fire, acoustic, thermal and moisture data, and the current status of any certificationNeeded to show equal performanceDocument list, issue dates, currency

Eight enquiries are drafted for review and have not been sent: BIAX, Durra Panel, HempBLOCK, KOSP, RespiraBuilt, a waffle pod supplier, a Queensland concreter and a prefabricated timber wall manufacturer.

First comparisons

  1. Conventional slab and a BIAX slab, engineered for the same site.
  2. Conventional internal partitions and Durra Panel.
  3. Conventional external walls and hemp block assemblies (not applying other suppliers’ prices to HempBLOCK).
  4. Site-built framing and prefabricated wall panels.

Return to The Circular Home.