The Circular Home · Research update
Early findings, and what we could not confirm.
First checks, 15 November 2026. Preliminary, and open to correction.

Sources were checked on 15 November 2026 from a workspace that cannot open every site. Where a page could only be read through a machine summary, we say so, and the figures should be confirmed against the original document before anyone relies on them.
Checked so far
Housing construction productivity has fallen Government research
The Productivity Commission’s research paper Housing construction productivity: Can we fix it? (February 2025) reports, for 1994-95 to 2022-23:
- Dwellings completed per hour worked fell 53%. This measure does not adjust for homes becoming larger and better finished.
- After adjusting for size and quality, labour productivity in dwelling construction fell 12%, while whole-economy labour productivity rose 49%.
- A detached house took about 10.4 months to complete in 2023-24, up from about 6.4 months a decade earlier.
The paper identifies slow approvals, low innovation, fragmented small firms and workforce constraints as causes. It sets out reform directions, including reducing regulatory barriers to prefabrication and modular building. It does not make formal recommendations. Limit: read through a summary of the PDF, so confirm figures and page references against the original. The paper says other advanced economies also saw construction productivity lag.
What this means for us: there is room to ask whether fewer, simpler site activities could help. It does not show that any particular system would.
A hempcrete wall had about 20% lower embodied emissions than brick veneer in one case Academic research
Tam, Shiel, Liu and Crawford, Embodied emissions of hempcrete wall systems in residential buildings: a comparative case study from Australia, a conference paper at the 58th Architectural Science Association conference (Melbourne, December 2025), DOI 10.65388/GUHF1340. It is a process-based life cycle assessment (cradle to grave) of one single-storey dwelling at Narara Ecovillage, New South Wales. The hempcrete walls were reported at 49.57 t CO2e against 61.81 t CO2e for brick veneer, about 20% lower. Long-distance transport of materials was reported as the dominant source of emissions.
Limits: one house, one conference paper, and we have not established how it was reviewed. We read the publisher’s abstract page through a summary and have not read the full paper, its boundaries or its assumptions. The page also reports a lightweight steel cladding result that we have not examined. This is not evidence that hempcrete is lower carbon in general. Our HempBLOCK profile keeps its own caveats, including that its historical CodeMark certificate may no longer be current.
A Queensland cost benchmark for a 235 m² detached house Reported by research partner
The Centre for International Economics report Costs of Housing Regulation in Queensland, prepared for the Queensland Productivity Commission, is reported to include Figure A.21, Detached house hard construction costs, Brisbane, in its appendix just before printed page 64. It assumes a 235 m² house, the average new Queensland house size in 2024. Reported figures, excluding GST:
| Estimate (adjusted for greenfield construction) | Hard construction cost |
|---|---|
| ABS | $367,814 |
| Rawlinsons | $442,814 |
| Rider Levett Bucknall (project homes) | $555,899 |
| CIE average | $455,509 |
The researchers are reported to have applied an 11.5% greenfield construction discount and an additional 30% adjustment to the Rider Levett Bucknall custom-home estimates, to reflect project-home construction. We checked the arithmetic: the three estimates average $455,509, which is about $1,938 per m² excluding GST over 235 m². Scaling that rate to 150 m² gives about $290,700 excluding GST, or about $319,800 including 10% GST (reported as $319,826).
How we use it: as a calculated result and a sanity check on our rounded $319,000 hypothetical framework, which we keep as a modelling assumption and not a finding. The benchmark is adjusted project-home economics for a larger house. Smaller or individually designed homes may have higher unit costs, because fixed costs are spread over less floor area, so a simple scaling down is a floor for discussion, not a price.
Limits: we have not opened the PDF ourselves, so the figures and the adjustments are reported by our research partner and not read by us. The publication page we did read lists three other housing types and a copyright year of 2025 against a listed date of 2 February 2026, which we have not reconciled. Source: CIE report (PDF).
Durra Panel: a manufacturer comparison for one internal wall Manufacturer information
The manufacturer publishes a comparison for a standard 12 m × 2.4 m wall (28.8 m²), as reported to us:
| Measure | Conventional stud and plaster | Durra Panel |
|---|---|---|
| Installed cost per m² | $83.60 | $77.67 |
| Installation time | 16 hours | 6 hours |
| Trades | Two | One |
| Wall total (calculated) | $2,407.68 | $2,236.90 |
Calculated difference: $170.78, about 7.1%, and ten hours, 62.5% of the conventional time. We checked these sums. The manufacturer describes the comparison as indicative and dependent on project conditions.
Limits: this is manufacturer-supplied evidence, not independently verified installed-cost data. GST treatment, crew sizes, what a labour hour means and whether the two assemblies perform equally (structure, fire, acoustic, services, finish) are not confirmed. It covers one wall, not a whole house. We have not read the page ourselves. Source: Durra Panel. See the Durra Panel profile.
Prefabrication in Australia: a systematic review Academic research
Wells, B., Shou, W., Wang, J., Ruan, X. and Sun, H. (2026), Unpacking the economic challenges of prefabricated construction in Australia: a systematic review, International Journal of Construction Management 26(15), 3638 to 3655, published online 23 February 2026, DOI 10.1080/15623599.2026.2630276. The abstract is reported to describe potential reductions of up to 60% in project duration, 37% in transport requirements and 15.38% in construction waste, and to identify barriers: upfront investment, logistics, fragmented supply chains and regulatory challenges.
Limits: these are findings drawn from the literature, not guaranteed outcomes for Australian homes, and each depends on the studies behind it. We have not read the paper ourselves, so the figures are reported, not checked.
A Victorian hemp builder reported about $500 to $600 per m² for cast-in-place hempcrete and $100 to $150 for blocks Trade and editorial media
An ABC News regional story (Francesco Salvo, ABC Mildura-Swan Hill, 14 April 2024) about a couple hand building a hempcrete house in Swan Hill quotes Melbourne-based hempcreter Will Brain. He said that per square metre, cast-in-place hempcrete is “about $500 to $600” and the block method “around $100 to $150, so 20 per cent of the price”. He also said traditional hempcrete builds cost about 20 per cent more than a standard home, and that specialist labour at installation is a major cost barrier. The story says proponents estimate hempcrete has been used in about 300 Australian homes.
He also reported ten traditional hempcrete builds over four years and four prefabricated-block builds in six months. Research leads: Will Brain and his prefabricated hemp block business, to be approached for quotes with stated inclusions. These figures are not applied to HempBLOCK.
Limits: these are one business operator’s spoken estimates, reported by a news outlet, and he also runs a business selling prefabricated hemp blocks. The article does not say what the square metre rate measures (wall area or floor area), what it includes (materials, labour, finishes, structure), whether it includes GST, or when the figures were set. They are from 2024 and from Victoria. We therefore do not treat them as comparable installed wall costs, and we will not compare them with conventional wall costs until we have quotes with stated inclusions. The Preston house itself (about 400 m², mostly owner built) does not give a cost per square metre.
Design For Place and Mallee House Government source
Read by us from the official documents: Mallee House (Brisbane) is a single-storey, three-bedroom, two-bathroom home with a study nook and 148 m² of enclosed living area, plus a 26 m² garage. Its Design Options document models 8.5, 9.2 and 10 star variants. The base Design For Place designs are reported to target 7 stars and 60/100 Whole of Home. Details and a preliminary takeoff are on the reference building page.
Licence: the YourHome copyright page permits hosting Design For Place plans and modified versions under CC BY 4.0, with the prescribed attribution, preserved disclaimers, identified modifications and respect for any third-party exclusions. Attribution: © Commonwealth of Australia 2026. Design For Place is licensed under CC BY 4.0, and provided free of charge at www.yourhome.gov.au. If we publish modified designs we will use the government’s adaptation wording. The drawings are preliminary guides, not certified documentation, so site-specific design, engineering, regulatory assessment and certification remain necessary. Sources: copyright, disclaimer.
Reported to us, not yet verified
The three items marked “reported” above (the Queensland cost benchmark, the Durra comparison and the prefabrication review) came from our research partner. We have checked the arithmetic but not opened the sources. One further item is open.
| Item | Status | Next step |
|---|---|---|
| Other cost benchmarks | Not yet gathered: current South East Queensland builder pricing, completed projects, prefabricated housing manufacturers and supplier quotes. | Collect, with inclusions, GST treatment and dates recorded, using the quotation schedule. |
| Reference slab and footings | The 100 mm slab is not inherently non-compliant: the NCC 2022 Housing Provisions are reported to illustrate 100 mm slab panels in certain systems, and there is no universal 125 mm minimum (reported, not read by us). The Mallee figure appears to be the slab panel for energy modelling. Edge beams, internal beams, reinforcement, site class and footing design remain unknown. | Engineering for a hypothetical Class S site. See the foundation comparison. |
A hypothetical cost framework
Hypothetical scenario Everything in this section is a modelling framework, not a finding. The figures have not been independently costed and are not a quotation.
Research targets, not promises: we want to test whether hard construction cost for about 150 m² could come in below $300,000 including GST, with $250,000 as an aspirational target.
The table is an illustrative allocation for a $319,000 conventional home. It will be replaced, line by line, with measured quantities and credible cost information.
| Building element | Illustrative budget |
|---|---|
| Site preparation and earthworks | $12,000 |
| Foundations and slab | $32,000 |
| Structural framing | $29,000 |
| External walls and cladding | $30,000 |
| Roof structure and covering | $25,000 |
| Windows and external doors | $22,000 |
| Internal walls and ceilings | $22,000 |
| Insulation | $7,000 |
| Plumbing and drainage | $22,000 |
| Electrical | $16,000 |
| Kitchen and cabinetry | $20,000 |
| Bathrooms and laundry finishes | $20,000 |
| Flooring and painting | $19,000 |
| Internal doors and hardware | $8,000 |
| Builder preliminaries, overhead and margin | $35,000 |
| Total | $319,000 |
The lines add up to the total (checked). The total itself came from a simple extrapolation of a per-square-metre figure that we have not verified, so treat it as a placeholder.
Why time matters: an illustration
Suppose a construction programme were eight weeks shorter, with $1,500 a week of avoidable site overheads and an average construction loan balance of $300,000 at 6.5%. Site overheads: 8 × $1,500 = $12,000. Finance: $300,000 × 6.5% × 8/52 = about $3,000. Combined: about $15,000. This is arithmetic on assumed inputs, not a saving shown by any project, and any saving already counted in elemental costs must not be counted again.
Outstanding questions
- What do builders in South East Queensland actually build and charge today for a simple 150 m² home, with every inclusion stated?
- Which footing system (stiffened raft, EPS waffle pod, BIAX or screw piles) suits each site class for the Mallee House, and at what installed cost?
- For alternative foundation, wall, insulation and lining systems: what are the complete installed costs, labour hours, finishing, services integration, fire, acoustic, moisture and structural requirements?
- Does Durra Panel reduce total cost, time and resources for a whole house, or only for one wall? Can conventional framing be reduced?
- Hemp: what do the reported $500 to $600 and $100 to $150 per square metre rates actually cover, and how do cast-in-place hempcrete, prefabricated blocks and factory panels compare on installed cost, drying time, weatherproofing, compliance, transport and Australian supply?
- Does panelised construction beat fully modular and site-built construction for a house of this size, once transport and on-site work are counted?
- How many separate activities and trade visits does a conventional house need, and how many could be removed?
- Over 30 or 50 years, how do the scenarios compare on energy, maintenance, replacement, insurance, moisture risk, carbon and end-of-life recovery?
- Which products are genuinely available in Australia, where are they made, and what is their regulatory pathway?
Research leads still to investigate (not recommendations): Will Brain and his prefabricated hemp block business, saveBOARD, PolyRok, Wagners Earth Friendly Concrete, Habitech Systems, Carbonlite, Ecoliv, Saltair Modular, screw pile foundations, prefabricated timber frame makers, recycled and renewable insulation, EcoCocon, IsoHemp, and panelised and circular construction from Europe, Scandinavia and Japan.
Follow progress in The Research Notebook, or return to The Circular Home.