The Circular Home · Research update

Assembly comparisons.

Complete building assemblies compared side by side, with what each might remove or add elsewhere.

Illustrative timber fabrication workshop with workers assembling insulated prefabricated building panels.
Rethinking how buildings are manufactured, assembled and delivered. Illustrative only: not an actual manufacturer’s facility or a verified assembly. AI-generated concept imagery for Circular Abundance.

Status: a research framework. We compare complete assemblies at equivalent performance. The key question for each is whether an alternative system removes materials or construction activities elsewhere in the building, and whether it adds any. Entries marked as manufacturer information are claims, not our findings, and prices appear only where a source supplied them.

1. Foundations

Stiffened raft, EPS waffle pod, BIAX and screw piles are compared in the foundation comparison.

2. Internal partitions and Durra Panel

The Mallee options specify 10 mm plasterboard on timber framing, with R1.0 or R2.0 batts. See the Durra Panel profile and the fuller installed-cost and programme comparison, which replaces the illustrative arithmetic below.

Activity or itemConventionalAlternativeCould it remove or add work elsewhere?
StructureTimber or steel studs, plates and nogginsSelf-supporting straw panel, 50 or 58 mm thick (manufacturer information)May remove framing. Fixing method, panel joints and height limits to confirm
LiningsPlasterboard on both facesPanel face serves as the lining (manufacturer information)May remove one lining operation. Finish quality and jointing to confirm
InsulationBatts in the cavity (R1.0 or R2.0 in the Mallee options)Panel is reported at R0.62 for 50 mm (EPD)Acoustic and thermal equivalence not established
ServicesRun in the stud cavityNo cavity. Routing, surface fixing or other methods neededMay add work for electrical and plumbing. To confirm with installers
FinishingSet, sand, paintFinish system to confirmUnknown
Labour and equipmentReported 16 hours, two trades for a 28.8 m² wall (manufacturer comparison)Reported six hours, one tradeCrew sizes and hour definitions unconfirmed
ComplianceFire, acoustic and moisture ratings to the NCCDocumentation to obtain, including fire and acoustic dataWet areas need separate treatment

Hypothetical scenario Illustrative arithmetic only. This scales the manufacturer’s one-wall rates (conventional $83.60/m² and 16 hours per 28.8 m², Durra $77.67/m² and six hours) to our estimated internal partition wall area. It is not a quotation, not a finding that the house would save this, and it covers partitions only. GST treatment, crew sizes and equivalent performance are unconfirmed.

CasePartition wall areaConventional at $83.60/m²Durra Panel at $77.67/m²DifferenceConventional hoursDurra hours
Low129.2 m²$10,801$10,035$7667227
Central143.6 m²$12,005$11,153$8528030
High158.0 m²$13,209$12,272$9378833

3. External walls and hemp construction

The Mallee options give two wall types. A hemp wall is not a swap: it changes structure, thickness, finishes and the trades involved. We do not apply the reported $500 to $600 and $100 to $150 per m² hemp rates (Will Brain, via ABC, 2024) to this wall, because their inclusions are unknown, and we do not apply them to HempBLOCK. See the HempBLOCK profile. Net external wall area is about 95 m² (range 86 to 105 m²) in the takeoff.

Activity or itemConventionalAlternativeCould it remove or add work elsewhere?
StructureTimber frame, or brick veneer on a timber frame (the two Mallee options)Load-bearing LB 300 blocks around a steel and concrete frame, or non-load-bearing HB Series blocks (manufacturer information)May change footing loads and add structural steel and concrete. Wall thickness changes floor area and window reveals
InsulationR2.5 batts (Mallee options)Hemp and binder block thermal performance, installed and modelledEquivalent R value and thermal mass need NatHERS modelling
Weather barrier and claddingSarking, battened air gap, 9 mm fibre cement, or brickRender or lime finish, and flashings and sill detailsUnknown
Internal lining10 mm plasterboardInternal render or plasterMay remove plasterboard. To confirm
Labour and timeFramers, cladder, bricklayer if brickBlock layers, framers, render crew. Company claims 50 to 70% faster erectionUnverified. Trained labour is scarce
SupplyLocalImported blocks (HempBLOCK) or local makers. Lead times and freight to confirmSupply risk
ComplianceDeemed-to-satisfy in the NCCCertificate currency unconfirmed for HempBLOCK. Alternative solution or other evidence may be neededDo not assume compliance

4. Conventional framing and prefabricated wall panels

The review by Wells and others (2026) reports potential reductions of up to 60% in duration, 37% in transport and 15.38% in construction waste, and names upfront investment, logistics, fragmented supply chains and regulation as barriers. These are literature findings, not outcomes for this house, and we have not read the paper.

Activity or itemConventionalAlternativeCould it remove or add work elsewhere?
FabricationFrame cut and assembled on site, wall by wallPanels made in a factory, then deliveredMay remove site cutting and waste. Adds transport and handling
Insulation and wrapFitted on site after the frameMay be fitted in the factoryCould change the order of trades
Windows and doorsFitted on siteMay be fitted in the factoryNeeds accurate openings and design freeze before manufacture
EquipmentHand tools, nail guns, scaffoldCrane or lifter, delivery truckSite access matters
ProgrammeWeeks of site framingReview reports up to 60% shorter project duration in the literature (not read by us)Not a guaranteed Australian result. Does not include approval and manufacture lead time
TolerancesAdjusted on siteNeeds a flat, accurate slab and set-outSlab tolerance may add cost
ComplianceFraming to AS 1684 or engineeringEngineered panel designs and certificationDocumentation to obtain

What we need

Quotes, installer hours and complete installed assemblies, using the quotation schedule. We will replace each hypothetical entry as information arrives, and publish what we learn, including where an alternative adds work.

Back to The Circular Home, the reference building and takeoff or the quotation schedule.